Steel structure factory building lighting, cleaning work how much per square meter can be done?

1. If you contract for materials, it is about 400 yuan per square meter, which has something to do with the amount of steel used, and you also need to look at the specifications and materials of the panel materials. Different projects cost differently. I hope it can help you.

2. The price of cleaning workers calculated by square meters is more scientific than that calculated by weight.

3. If the cleaning workers of ordinary light steel structure factory buildings are calculated according to tonnage, it is generally about 600 yuan per ton, and the price may vary from place to place.

4. The general steel structure installation package cleaners quote according to the following principles: the installation quotation of the main structure is calculated according to tonnage, the installation quotation of the enclosure system is calculated according to the actual area, and other auxiliary parts are calculated according to the actual quantity. One of the main types of building structures in steel structure engineering. It is one of the more common structural forms in modern architectural engineering.

5. About 50 won 100 yuan, depending on the amount of steel used and the equipment and accessories contained.

6. light steel structure or heavy steel structure, the labor cost is not the same.

How much is the lighting installation of the steel structure factory building?

If the contractor contracts the materials, it is about 400 yuan per square meter, which has something to do with the amount of steel used, and it also depends on the specifications and materials of the panel materials. The cost of different projects is different. I hope it can help you.

It is usually about 30-35 yuan per square meter. Steel structure installation introduction: the maintenance load on the working platform should pay attention to the reduction of the main beam (0.85) and column (0.75).

As of 2019, it usually varies from 30 to 60 per square meter of plant area. Light steel structure or heavy steel structure, labor costs are not the same.

At a height of 12 meters, how much does it cost to install lighting and emergency lights per square meter?

1. The cost of installing emergency lights depends on the quantity of your project. If the amount of work is large, the power supply is preset. The installation fee ranges from 15 to 20 yuan each. It’s hard to say if you install one separately. Nowadays, labor is very expensive, and it is reasonable to charge 100 yuan for a car. The laying of the power cord should be calculated separately.

2. A forklift and a pallet two people who work eight hours a day can probably install 50 lamps and cloth wiring slots. According to the data, the labor cost of installing a lamp in a 15-meter-high factory building is about 200 yuan.

3, this price, really not much, in our case, the same case, at least 12000 of which includes the cost of lamp pole lamps, underground cables (this is optional), labor costs, vehicle shift fees, debugging fees.

4. As far as I know, the cost of outdoor high-altitude installation of lamps and lanterns is generally 500 yuan per square meter, and there are still 300 yuan per square meter. Below 5m and 10m from the floor of the building, 15% of the operating height of the labor fee is above 10m and 20m above the floor of the building, and the scaffolding cost of 20% of the labor fee includes 25% of the labor wage.

How much is the price for plant decoration? list of quotation for plant decoration per square meter

But in fact, the price of plant decoration still has something to do with the grade of decoration, ordinary simple factory decoration is about 300,600 yuan per square meter; the price of medium plant decoration is about 700-1000 yuan, while the price of high-quality plant decoration is more than 1200 yuan. Specifically, we should refer to the actual decoration project.

At present, the decoration price of the ordinary workshop on the market is between 600 yuan and 800 yuan per square meter, the decoration price of the middle workshop is between 800 yuan and 1200 yuan per square meter, and the decoration price of the factory building is between 1200 yuan and 1600 yuan per square meter.

The price of ordinary industrial plant decoration is between 600,800 yuan per square meter; the price of mid-range industrial plant decoration is between 800 yuan and 1200 yuan per square meter; and the price of industrial plant decoration is between 1200 yuan and 1600 yuan per square meter.

How much is the decoration of the factory?

But in fact, the price of plant decoration still has something to do with the grade of decoration, ordinary simple factory decoration is about 300,600 yuan per square meter; the price of medium plant decoration is about 700-1000 yuan, while the price of high-quality plant decoration is more than 1200 yuan. Specifically, we should refer to the actual decoration project.

Different grades of decoration costs are also different if it is decorated into an ordinary factory building, the price per square meter is between 600,800 yuan, while the mid-range decoration is between 800,800 yuan and 1200 yuan, the decoration must be higher, generally between 1200 and 1600 yuan.

How much is a square meter of plant decoration in Shenzhen? if you choose all-inclusive decoration, you can refer to the following price: if you choose to decorate the plant, the decoration price is about 1300 Mel 1400 / square meter. If you choose popular decoration, the decoration price of the plant is about 800Mel 900 yuan / square.

How much is the plant decoration per square meter? According to the survey, the price of ordinary plant decoration per square meter is generally between 600 yuan and 800 yuan; the price of mid-range plant decoration is generally between 800 yuan and 1200 yuan; and the price of high-end plant decoration is generally between 1200 yuan and 1600 yuan.

Therefore, in the whole decoration budget, decoration materials can directly affect the price of plant decoration, and the factors that affect the change of material costs are mainly from the brand and purchase channels and so on.